Saturday 23 February 2008

It's Getting Closer

So this morning, the postman delivered the inventory of the house of what is and what is not included with the sale of the house - this can only mean one thing - that settlement is on it's way (or exchange for the British readers).
It's both exciting and nerve wracking as I am looking at the pre and post mortgage budget --- boo hoo --- it's time to pull the belt in some what.
I spent the morning trying to prioritise the order of works for the flat - then we can see what is left to do and not left to do. This is how I think I will do it:
  • Studio room
    • Carpets up
    • Aqua-Loc+ flooring laid
    • Wallbed installed.
    • Wardrobe arranged / fitted including extra storage.
  • Kitchen Set Up
    • As outlined in the kitchen blog - nice galley kitchen which will allow for the wall to be opened up when/if the bathroom is moved.
    • Open French door to garden
    • Knock wall out into 'ex' bathroom space.
  • Bathroom
    • Build bathroom as per bathroom blog
    • build in window / sky light & fan
    • Clear out old bathroom, knocking down joining wall to kitchen and to use full floor to ceiling french style windows out to garden.
  • Flooring
    • Aqua-Loc+ the new areas so that it is uniform in colour & presentation.
  • Garden (this plan if the extension plans are not approved)
    • Build decking or pave outside new area at kitchen.
    • Building BBQ area
    • Hanging pots for strawberries
    • Room for developing fruit trees and shrubs.
  • Outside office/shed - which has to be be built 5 metres from the current dwelling IF the application to build a conservatory is denied. It will be nicely connected to the new decking or paved area.